Home > Search > Document Search > Docket Details > Document Details

Document Details


3/3/2020

Thomas K. Chenal, Chairman Siting Committee

Arizona Power Plant and Transmission Line Siting Committee

0000201102



Filings Dealing with Line Siting/Power Plants Re-Zoning Issues

Line Siting/Power Plant Issues

Docket Number Filed Company Name Type Description Docket Details
L-00000C-20-0007-00186 1/15/2020 Tucson Electric Power Company Siting Committee In the matter of the Application of Tucson Electric Power Company, in conformance with the requirements of A.R.S. § 40-360, et. seq., for a Certificate of Environmental Compatibility authorizing the Irvington to East Loop 138 kilvolt (kV) Transmission Line Project, which includes the construction of new 138 kV transmission lines originating at the Irvington Substation (Section 03, Township 15 South, Range 14 East), with an interconnection at the Port Substation (Section 18, Township 15 South, Range 15 East) and the Patriot Substation (Section 31, Township 14 South, Range 15 East), and terminating at the East Loop Substation (Section 08, Township 14 South, Range 15 East, each located within Pima County, Arizona.

No decisions found